Energy storage requirement for Solar PV connected to grid
In this post, energy storage requirement in India by 2032 is given here. The ESS requirement for medium voltage / low voltage grid support based on estimation penetration of solar PV connected to MV and LV grid.
Energy storage estimation for MV/LV grid
Estimation |
2019 |
2022 |
2027 |
2032 |
Thermal |
209 |
NA |
NA |
NA |
Hydro |
43 |
NA |
NA |
NA |
Nuclear |
6 |
NA |
NA |
NA |
Solar |
26 |
107 |
244 |
349 |
Ground mounted solar |
24 |
68 |
148 |
206 |
Rooftop PV |
1.5 |
40 |
98 |
144 |
Connected to EHV |
14 |
34 |
66 |
94 |
Connected to MV |
11 |
35 |
84 |
112 |
Connected to LV |
2 |
40 |
98 |
144 |
Wind |
35 |
NA |
NA |
NA |
Small hydro |
4.5 |
NA |
NA |
NA |
Biomass & Biopower |
10 |
NA |
NA |
NA |
Peak load (Bus) |
192 |
333 |
479 |
658 |
Annual energy
requirements |
1192 |
1905 |
2710 |
3710 |
Battery for LV grid |
241 |
5908 |
14617 |
21484 |
Battery for MV grid |
1054 |
3482 |
8393 |
11191 |
Total storage (MWh) |
1295 |
9390 |
23010 |
32675 |
Approximate (GWh) |
1 GWh |
10 GWh |
24 GWh |
33 GWh |
Peak load and annual
energy requirements are taken form CEA estimates. In congruence with RE target
of 175 GW by 2022, the calculation were done on the basis of 100 GW solar, out
of which 40 GW is RTPV, 20 GW is medium size installation and 40 GW is from
large solar parks. For the year 2027 and
2032, the ratio of RTPV were taken in accordance with the 2022 targets
consisting of 40% RTPV of total solar installed capacity.
Consolidated Energy Storage Roadmap India by 2032
During calculation of
energy storage, electric vehicles have assumed high priority in the country. In
India, large cities have emerged as the most polluted cities in India and
significant share coming out from automobiles. The government of India has launched
a national mission in March 2019 – TRANSFORMATIVE MOBILITY AND ENERGY STORAGE
MISSION, with the rapid innovation in the EVs competitive in the near term in
EV 2 wheelers, 3 wheelers, Cars, Buses and Good carriers. The expected
requirements of batteries for EVs is much higher that for grid support. The
study made by power grid corporation of India (POWERGRID) in 2013 for green
corridor report suggested 500 MWh of ESS requirement for integration of 31 MW
GW of RE.
Applications |
Energy Storage (GWh) |
|||
2019-22 |
2022-27 |
2027-32 |
Total by 2032 |
|
Grid support: MV/LV |
10 |
24 |
33 |
67 |
Grid support: EHV |
7 |
38 |
97 |
142 |
Telecon towers |
25 |
51 |
78 |
154 |
Data centers, UPS and
inverters |
80 |
160 |
234 |
474 |
Miscellaneous
application (Railways, Rural electrification and HVAC Application) |
16 |
45 |
90 |
151 |
DG usage minimization |
- |
4 |
11 |
14 |
Total stationary (GWh) |
138 |
322 |
543 |
1002 |
E Vehicles: E2W |
4 |
51 |
441 |
496 |
E Vehicles: E2W |
26 |
43 |
67 |
136 |
E Vehicles: E2W |
8 |
102 |
615 |
725 |
Electric bus |
2 |
11 |
44 |
57 |
Total electric vehicles (GWh) |
40 |
207 |
1167 |
1414 |
Total energy storage demand (GWh) |
178 |
529 |
1710 |
2416 |