06/02/2025

Estimation of Energy Storage Requirement by 2032

Energy storage requirement for Solar PV connected to grid

In this post, energy storage requirement in India by 2032 is given here. The ESS requirement for medium voltage / low voltage grid support based on estimation penetration of solar PV connected to MV and LV grid.

Energy storage estimation for MV/LV grid


Estimation

2019

2022

2027

2032

Thermal

209

NA

NA

NA

Hydro

43

NA

NA

NA

Nuclear

6

NA

NA

NA

Solar

26

107

244

349

Ground mounted solar

24

68

148

206

Rooftop PV

1.5

40

98

144

Connected to EHV

14

34

66

94

Connected to MV

11

35

84

112

Connected to LV

2

40

98

144

Wind

35

NA

NA

NA

Small hydro

4.5

NA

NA

NA

Biomass & Biopower

10

NA

NA

NA

Peak load (Bus)

192

333

479

658

Annual energy requirements

1192

1905

2710

3710

Battery for LV grid

241

5908

14617

21484

Battery for MV grid

1054

3482

8393

11191

Total storage (MWh)

1295

9390

23010

32675

Approximate (GWh)

1 GWh

10 GWh

24 GWh

33 GWh

 

Peak load and annual energy requirements are taken form CEA estimates. In congruence with RE target of 175 GW by 2022, the calculation were done on the basis of 100 GW solar, out of which 40 GW is RTPV, 20 GW is medium size installation and 40 GW is from large solar parks.  For the year 2027 and 2032, the ratio of RTPV were taken in accordance with the 2022 targets consisting of 40% RTPV of total solar installed capacity.

Consolidated Energy Storage Roadmap India by 2032

During calculation of energy storage, electric vehicles have assumed high priority in the country. In India, large cities have emerged as the most polluted cities in India and significant share coming out from automobiles. The government of India has launched a national mission in March 2019 – TRANSFORMATIVE MOBILITY AND ENERGY STORAGE MISSION, with the rapid innovation in the EVs competitive in the near term in EV 2 wheelers, 3 wheelers, Cars, Buses and Good carriers. The expected requirements of batteries for EVs is much higher that for grid support. The study made by power grid corporation of India (POWERGRID) in 2013 for green corridor report suggested 500 MWh of ESS requirement for integration of 31 MW GW of RE.

Applications

Energy Storage (GWh)

2019-22

2022-27

2027-32

Total by 2032

Grid support: MV/LV

10

24

33

67

Grid support: EHV

7

38

97

142

Telecon towers

25

51

78

154

Data centers, UPS and inverters

80

160

234

474

Miscellaneous application (Railways, Rural electrification and HVAC Application)

16

45

90

151

DG usage minimization

-

4

11

14

Total stationary (GWh)

138

322

543

1002

E Vehicles: E2W

4

51

441

496

E Vehicles: E2W

26

43

67

136

E Vehicles: E2W

8

102

615

725

Electric bus

2

11

44

57

Total electric vehicles (GWh)

40

207

1167

1414

Total energy storage demand (GWh)

178

529

1710

2416

 