Solar cell e-waste management
The India’s total installed capacity of solar energy till march 31, 2014 was 2.28 GW and as November 30, 2023, cumulative installed capacity reached 72.31 GW. The ministry of environment, forest and climate change, government of India has notified e – waste management rules, 2022 on 2nd November, 2022. As per rules, every manufacturer and producer of solar modules / cells / panels shall
Solar e-waste management rules
- Registration on the portal
- Store solar photo-voltaic modules or panels or cells waste generated up to the year 2034-2035 as per the guidelines laid down by the Central Pollution Control Board in this regard
- File annual returns in the laid down form on the portal on or before the end of the year to which the return relates up to year 2034-2035
- Ensure that the processing of the waste other than solar photo-voltaic modules or panels or cells shall be done as per the applicable rules or guidelines for the time being in force
- Ensure that the inventory of solar photo-voltaic modules or panels or cells shall be put in place distinctly on portal
- Comply with standard operating procedure and guidelines laid down by the Central Pollution Control Board in this regard.
- The recycler of solar photo-voltaic modules or panels or cells shall be mandated for recovery of material as laid down by the Central Pollution Control Board in this regard.
- Ensure earmarking or allocation of industrial space or shed for e-waste dismantling and recycling in the existing and upcoming industrial park, estate and industrial clusters
Reference: E-waste mangement govt rules pdf
No comments:
Post a Comment