Solar Park
The scheme for development of Solar Parks and Ultra Mega Solar Power Projects was rolled out in 12.12.2014. The capacity of the solar park scheme was enhanced from 20,000 MW to 40,000 MW on 21.3.2017 to set up at least 50 solar parks. The time line of the scheme is extended till 2023 – 24.
- The capacity of solar parks is generally 500 MW and above, however smaller solar parks ( up to 20 MW ) are considered in states or UTs where shortage of non-agricultural land.
- Approximately 4 to 5 acre per MW of land is required for setting up solar parks.
CFA for Setting Up Solar Parks
- The ministry provides central financial assistance up to Rs. 25 lakh per solar park for preparation of detailed project report.
- The CFA of up to Rs 20 lakh per MW ( Rs 12 Lakh / MW for development of internal infrastructure of solar park and Rs 8 Lakh / MW for development of external power evacuation infrastructure of solar park ) or 30% of project cost including grid connectivity cost whichever is lower is provided under the scheme.
- The central grants approved under the scheme is Rs. 8100 crores.
Nodal Agency for Solar Park
- The solar energy corporation of India (SECI) & Indian Renewable Energy Development Agency (IREDA) implement the scheme under the direction from MNRE.
Selection of Solar Power Park Developers
- The solar parks are developed in collaboration with the state government and their agencies, CPSUs and private entrepreneurs.
- The solar park implementing agency is known as solar power park developer (SPPD) and may be selected in any of the eight modes of the solar park scheme.
Mode
|
Brief
Description of Mode |
CFA |
Mode
1 |
State
designated nodal agency OR State
government public sector undertaking ( PSU) OR Special
Purpose Vehicle (SPV) of state government |
Rs
12 lakh/MW for internal infrastructure & Rs
8 lakh/MW for external infrastructure OR 30%
of the project cost which is lower |
Mode
2 |
Joint
venture company of state designated nodal agency and SECI |
|
Mode
3 |
The
state designated SECI as the nodal agency |
|
Mode
4 |
Private
entrepreneurs with/ without equity partnership with state government |
|
Mode
5 |
Central
public undertaking (CPSUs) like SECI, NTPC etc. |
|
Mode
6 |
Private
entrepreneurs without any CFA from MNRE |
No
CFA |
Mode
– 7 |
SECI
will act as a solar power park developer (SPPD) for renewable energy parks |
Rs
20 lakh/MW for external infrastructure OR 30%
of the project cost which is lower |
Mode
– 8 |
CPSU/
State PSU / Government organization / their subsidiaries or JV of the above
entities acts as SPPD |
Rs
20 lakh/MW for internal infrastructure OR 30%
of the project cost which is lower |
Solar Parks in India
The progress of solar park as on 30.12.2021 is given as below.
Sr. No |
State |
Solar Park |
Sanctioned Capacity of Park (MW) |
Commissioned Capacity of Park (MW) |
1 |
Andhra Pradesh |
Ananthapuramu-I
Solar Park |
1500 |
1400 |
2 |
Kurnool
Solar Park |
1000 |
1000 |
|
3 |
Kadapa
Solar Park |
1000 |
250 |
|
4 |
Ananthapuramu-II
Solar Park |
500 |
400 |
|
5 |
Solar
Wind Hybrid Park |
200 |
|
|
6 |
Gujarat |
Radhnesada
Solar Park |
700 |
400 |
7 |
Dholera
Solar Park Ph-I |
1000 |
|
|
8 |
NTPC
RE Park |
4750 |
|
|
9 |
GSECL
RE Park |
3325 |
|
|
10 |
GIPCL
RE Park |
600 |
|
|
11 |
Himachal Pradesh |
Kaza
Solar Park |
880 |
|
12 |
Jharkhand |
Floating
Solar Park |
100 |
|
13 |
Deogarh
Solar Park |
20 |
|
|
14 |
Palamu
Solar Park |
20 |
|
|
15 |
Garwha
Solar Park |
20 |
|
|
16 |
Simdega
Solar Park |
20 |
|
|
17 |
Karnataka |
Pavagada
Solar Park |
2000 |
2000 |
18 |
Kalaburgi
Solar Park |
500 |
|
|
19 |
Kerala |
Kasargod
Solar Park |
105 |
100 |
20 |
Floating
Solar Park |
50 |
|
|
21 |
Madhya Pradesh |
Rewa
Solar Park |
750 |
750 |
22 |
Mandsaur
Solar Park |
250 |
250 |
|
23 |
Neemuch
Solar Park |
500 |
|
|
24 |
Agar
Solar Park |
550 |
|
|
25 |
Shajapur
Solar Park |
450 |
|
|
26 |
Omkareswar
Floating Solar Park |
600 |
|
|
27 |
Chhattarpur
Solar Park |
950 |
|
|
28 |
Morena
Solar Park |
1400 |
|
|
29 |
Barethi
Solar Park |
550 |
|
|
30 |
Maharashtra |
Sai
Guru Solar Park |
500 |
|
31 |
Patoda
Solar Park |
500 |
|
|
32 |
Dondaicha
Solar Park |
250 |
|
|
33 |
Manipur |
Bukpi
Solar Park |
20 |
|
34 |
Meghalaya |
Solar
park in Meghalaya |
20 |
|
35 |
Mizoram |
Vankal
Solar Park |
20 |
|
36 |
Odisha |
Solar
Park in Odisha |
40 |
|
37 |
Floating
Solar Park |
100 |
|
|
38 |
Rajasthan |
Bhadla-II
Solar Park |
680 |
680 |
39 |
Bhadla-III
Solar Park |
1000 |
1000 |
|
40 |
Bhadla-IV
Solar Park |
500 |
500 |
|
41 |
Phalodi-Pokaran
Solar Park |
750 |
300 |
|
42 |
Fatehgarh
Phase-1B Solar Park |
421 |
|
|
43 |
Nokh
Solar Park |
925 |
|
|
44 |
Uttar Pradesh |
Solar
Park in UP |
440 |
165 |
45 |
Jalaun
Solar Park |
1200 |
|
|
46 |
Mirzapur
Solar Park |
100 |
|
|
47 |
Parasan
Kalpi Solar Park |
65 |
|
|
48 |
Lalitpur
Solar Park |
600 |
|
|
49 |
Jhansi
Solar Park |
600 |
|
|
50 |
Chitrakoot
Solar Park |
800 |
|
|
|
33821 |
|